The chimneys are finally going up. We have stayed as close as possible to the original design but with a bluestone cap. The brick we picked out is Robinson - Cambridge and we are using JM Construction. As you can see from the photo below, Jim likes to live on the edge.
Here is the almost completed chimney. There is one more to build.
More sand blasting was done on Sunday. The cherry picker we rented is something no family should be without.
This is the future dining room wall with some of the plaster jackhammered off.
This is the same wall completely uncovered and sandblasted.
No comments:
Post a Comment